Within less than twelve months a remote distributed power facility can be designed,assembled and commissioned onsite driven by early stage communications between PowerIn and site personnel, that include environmental health and safety protocols and long term definition of power load requirements.
Purchase power agreements for electricity are intended to drive the performance of each site’s distributed power facilities, with power system reconfiguration offered for a fee on an as needed basis.